Port-Side Ballast Water Treatment & PortoBallast
Sea Clean AS helps port teams and vessel stakeholders define port-side treatment and complete PACT Marine onboard BWMS project scopes.
Sea Clean's first container has arrived
Sea Clean reports receipt of its first Euro Tech PortoBallast container on 7 October 2026. The supplied unloading photograph shows a side-loader truck at the waterfront. We intend to use the container as a training facility and a practical reference for vessel and port-side treatment discussions.

Euro Tech Holdings identifies itself as Nasdaq: CLWT in its June 2026 announcements and publicly named Sea Clean as its Norwegian strategic partner. PortoBallast is the product name, not a listed issuer. No unverified Mini/Micro variants are asserted.
The August 2026 brochure describes containerised filtration and medium-pressure UV treatment, with a separate function for neutralising surplus oxidants. Its reference treatment range is 50–300 m³/h. These manufacturer figures are subject to change and require confirmation against the offered unit, water envelope and project interfaces.
Arrival is not a commissioning record or discharge permission. Training dates, rental or operated-service availability, suitability, utilities, testing and required approvals need individual confirmation. Email links open drafts only; nothing is submitted to a website inbox.
Manufacturer and regulatory sources
- Euro Tech — PortoBallast brochure, August 2026 edition — Pages 2–4: process, tie-ins, technical envelope and dosing system; manufacturer data subject to change, not Sea Clean's as-built acceptance record.
- Euro Tech Holdings — mobile hybrid launch, 9 June 2026 — Issuer's announcement: Nasdaq CLWT, containerised terminal/barge deployment and trailer transport.
- Euro Tech Holdings — Sea Clean partnership announcement, 17 June 2026 — Names Sea Clean and the planned Norwegian coastal facility. Its dispatch forecast is not the actual receipt date.
- IMO — Ballast Water Management — Convention, management plans, discharge standards and the distinction between equipment approval and operational requirements.
PortoBallast knowledge and planning library
- First container received: 7 October 2026
- What is PortoBallast, and who is Euro Tech?
- Specifications: flow, power and footprint
- Sea Clean's planned training facility
- Rental periods and service scope
- BWTS breakdown contingency planning
- Vessel-to-shore connection checklist
- IMO D-2, testing and port acceptance
- TRO neutralisation versus full treatment
- Filtration, UV and sludge management
- Deployment at ports and terminals
- Mobile treatment versus onboard BWMS
HarborBallast reference concepts and complete onboard supply
The separate PACT 2021 HarborBallast catalog describes mobile trailer, fixed facility and mobile barge concepts. Its dated, indicative ranges are not PortoBallast specifications, Sea Clean capacity guarantees or certifications. Project hydraulics, utilities, permissions and acceptance require review.
Sea Clean can scope complete PACT Marine onboard UV/filter BWMS packages, parts, commissioning support, sampling/testing coordination and lifecycle service, subject to technical and applicable approval requirements.
Download the dated HarborBallast catalog (2021) · BWTS service and spare-parts enquiries
Frequently asked questions
When did Sea Clean receive its first PortoBallast container?
Sea Clean reports receipt on 7 October 2026 and intends to use the container as a training facility. Delivery is not a commissioning record or confirmation of immediate rental and treatment availability; project readiness and scope require confirmation.
Can I discuss PortoBallast rental or an operated service?
Yes, by email. Provide the vessel, installed BWMS, port, dates, water volume and purpose. Equipment hire, operated treatment and contingency coordination are distinct scopes. Availability, suitability, permissions and commercial terms must be agreed.
What port-side ballast water treatment concepts can Sea Clean scope?
Sea Clean can help scope mobile trailer, fixed facility and mobile barge concepts using PACT Marine's dated 2021 HarborBallast catalog as a reference. Hydraulic conditions, utilities, permits and port acceptance must be assessed for each project.
Are HarborBallast flow ranges guaranteed capacities?
No. The catalog ranges are indicative reference information only: mobile trailer 50–500 m3/h, fixed facility 50–5,000 m3/h and mobile barge 1,000–5,000 m3/h. They are not a Sea Clean capacity guarantee or certification.
Can Sea Clean supply onboard PACT Marine BWMS packages?
Sea Clean can scope and supply complete PACT Marine onboard UV plus filter BWMS packages, parts, commissioning-support, sampling and testing coordination, and lifecycle service, subject to technical review and project and approval requirements.
How is ballast water sampling and testing handled?
Sea Clean coordinates sampling and testing with independent ISO 17025 laboratories and flag- or class-authorised parties where required. The final sampling plan, attendance and documentation depend on the vessel, voyage and project requirements.
Sea Clean is not an accredited laboratory or approving authority. Sampling and testing are coordinated with appropriate independent ISO 17025 laboratories and authorised parties where required.